Mulberry Lane Suites And Cottages

In his early retirement years, Bob enjoyed time with family and serving through his local church. Whether he was serving as chairman of the finance team or volunteering as a cook for children’s camp, he modeled a true servant’s heart. He also volunteered with an Athens Hospice group, and did financial work for several small businesses..

Sherry Kelly is reluctant to talk about herself and her contribution to people near the community of Blair, Wisconsin.Jim Cappuccio is a retired physical education teacher who focused on adaptive sports.Jefferson Award Winner: Cassie BuehlerJefferson Award Winner: Cassie BuehlerCassie Buehler says too many people make excuses why they can’t volunteer. “Doesn’t matter you age, your skill set, your interests. The amount of time you can commit.

Now for the crepe paper rolled flower or cabbage rose, as they call them. This is a very simple flower to make. All you do is cut a strip of crepe paper and then fold both edges in lengthwise, the shorter the strip the smaller the flower. One of the most popular keypad document fire boxes is NOT a SentrySafe, but rather a Neiko. The Neiko Fit Anywhre Digital Electronic Safe. It is much better on the anti theft spectrum and also has a nice anchoring design that allows you to tastefully anchor it to walls or the floor so them thievers can’t take no safe away! The only complaints in reviews that really came up about this safe was that it is a bit on the small side and that it makes a loud beeping noise when you unlock it (which makes it less useful as a gun safe)..

208 West Lafayette, IN 47906 4510 Bids shall be for complete construction only, properly executed and submitted on Form 96, accompanied by executed Form 96A (as prescribed by the State Board of Accounts) giving financial data as recent as possible, and a Non Collusion Affidavit together with other documents as required by the Instructions to Bidders and addressed to The Trustees of Purdue University, clearly marked with the project and the bid opening date. Each bid must be accompanied by the Contractor’s written plan for a program to test the contractor’s employees for drugs in accordance with IC 4 13 18. Each bid must be accompanied by a Contractor’s Combination Bid Bond and Bond for Construction in the form included in the specifications made payable to The Trustees of Purdue University in an amount equal to the maximum total of the base bid and any alternate bids, guaranteeing the execution and faithful performance of the contract for the work if awarded. The Instructions to Bidders contained in the specifications for the projects are by this reference made a part hereof, and all bidders shall be deemed advised of the provisions thereof, and of the General Conditions of the contract, specifications, plans and drawings for the project. A voluntary pre bid meeting for Project No. EDT.

Tagged with:

Leave a Reply